An inside look at a failed roofing repair

Source: https://www.constructiondive.com, August 14, 2019
By: Kim Slowey

Dive Brief:

  • San Diego State University, inewsource reported, mishandled a $2 million renovation of its College of Professional Studies and Fine Arts building to the point that a former OSHA official called the project, which ended up shutting down the building because of released toxins in the air, “a case study in how not to do projects.”
  • The renovation was supposed to start last summer, but SDSU failed to secure the proper permits in time, so the schedule was changed so that work would begin in early 2019 when students were on break. After heavy rains, crews used Tremfix to seal the many roof leaks, but an aging and malfunctioning HVAC system failed to clear the building of vapors from the chemicals, which entered through nearby fresh air ducts on the roof. Testing revealed that the level of coal tar pitch volatiles was just under OSHA’s safe limit and above the National Institute for Occupational Safety and Health’s limits, even though crews tried various methods — some disruptive — to remove the fumes. Read more.

Find a Broker or Underwriter

Search by product, location or name
https://www.insurancebusinessmag.com/us/best-insurance/best-wholesale-brokers-usa--5star-wholesale-brokers-and-mgas-478736.aspxhttps://www.newsweek.com/rankings/most-loved-workplaces-2024https://premium.insurancebusinessmag.com/us-iba-top-insurance-employers-2024-ryan-specialty/p/1

Please Update Your Browser

Unfortunately Microsoft is no longer providing support or security fixes for your web browser. RT Specialty values the safety and security of its clients’ data, and as such this site requires the use of a modern web browser. To update your web browser, please see the links below. If you have any questions or would like additional information, please email info@rtspecialty.com or call (312) 784-6001.

Firefox Firefox Chrome Chrome IE Internet Explorer Edge Microsoft Edge