Boston’s year-old $2.3B Green Line Extension needs repairs
Source: https://www.constructiondive.com/, October 26, 2023
By: Julie Strupp
In an Oct. 19 press conference, Eng said the contractor should cover the expense of the repairs, but the agency has not yet determined the cost. An MBTA representative told Trains.com the agency will hold discussions with the builders as part of closing out their contract.
“The problem is tied to the fabrication of the ties and the plates,” Eng told the Boston Globe, and the plates were “pre-installed.” Read more.