Electrical Contractor – Asbestos
Acknowledgement to Great American Environmental Division
While installing new electrical lines in a historic building the contractor used a hole saw to cut through a ceiling. Unknown to the contractor, the saw had inadvertently disturbed and released asbestos-containing insulation material. The contractor had to pay for clean-up costs for the asbestos fibers released throughout the building.