Hospital Renovation and Expansion
Single prime delivery system for a public hospital renovation and expansion project. MEP engineer failed to specify correct type of piping to carry “clean steam” through the hospital, resulting in system-wide pipe failure and risk of pressure combustion. Remedial plan consisted of complete removal and replacement of piping. Owner claim against the design team for repair costs exceeded the available primary design professional insurance.