Mold
Source: https://www.greatamericaninsurancegroup.com/
A general contractor, building a large senior living complex using wood frame construction, experienced frequent rains during the early stages of construction. Unfortunately, this led to delays in the work, allowing the wood frame to be exposed to the weather for extended periods. As a result, water damage and significant mold growth occurred. This appeared to require tearing out all existing work that had been done, causing a delay in construction. Luckily, through the involvement of the insurance carrier, a mold remediation plan was put in place allowing work to continue on schedule. Read more.