Pile Driving Contractor – Waste Oil
Acknowledgement to Great American Environmental Division
A pile driving contractor punctured an unknown underground storage tank which resulted in the release of waste oil. The waste oil impacted adjacent soils and forced the job to stop until the materials could be delineated, excavated and properly disposed.