Street and Road Contractor – Petroleum-Impacted Sediment
Acknowledgement to Great American Environmental Division
Inadequate erosion control measures implemented during construction of an abutment for a highway overpass resulted in petroleum-impacted sediment to be deposited into a pristine waterway. The street and road contractor was required to pay for clean-up costs and natural resource damages.