Single prime delivery system for a public hospital renovation and expansion project. MEP engineer failed to specify correct type of piping to carry “clean steam” through the hospital, resulting in system-wide pipe failure and risk of pressure combustion. Remedial plan consisted of complete removal and replacement of piping. Owner claim against the design team for […]
Foreign Governmental Entity sued the design engineer on an overseas dam and processing facility project, after the dam experienced a catastrophic failure. Owner alleged that the design engineer included an inadequate safety factor in the design of the dam, and specified an inappropriate dam filling rate in the specifications. Alleged damages of $50,000,000 exceeded design […]
State Transportation Authority sued the geotechnical engineer, project engineer and construction manager on a $250,000,000 highway expansion project, following a catastrophic failure of a section of one of the bridges. Authority alleges that the pre-construction sub-surface geotechnical investigation was insufficient, and that the construction manager was negligent in its construction oversight duties. Asserted damages of […]
State Transportation Department sued the project engineer on a new bridge construction project after an expansion deck failure led to cost overruns and re-design costs. $2,000,000 claim amount exceeded civil engineer’s available professional liability coverage, which had been depleted by other claims. Matter settled for $1,000,000 above the design professional insurance.
State Entity overseeing a multi-billion dollar civil infrastructure project (highways, bridges, tunnels) sued the design team for $300,000,000 related to cost overruns, design errors, traffic software design flaws. Alleged damages significantly exceed the total available design professional insurance.
Owner of a 500-unit single-family community project sued the civil engineer who designed a dam, spillway and bridge, which were intended to create a lake and centerpiece of new community. The dam failed, leading to $5,000,000 in owner claims related to increased construction costs, delay and diminished project value. Alleged damages exceeded civil engineer’s $1,000,000 […]
Owner of a $50,000,000 light rail and transportation hub upgrade project sued the design-builder for $15,000,000 in additional project costs and delay relating to inadequate static frequency converter design.  Asserted claim amount exceeded the $1,000,000 in professional liability coverage held by design-builder. Settlement achieved for $1,000,000 above the available design professional insurance.
Single prime design delivery system for construction of a new dental school facility associated with a University. University made claim against the architect alleging design errors relating to structural steel; Life Safety Code violations; non-insulated pipe failures; Â failure to properly staff project; failure to perform contract administration duties; lost value engineering opportunities; and project delay. […]
Multiple prime design delivery system for construction of new elementary and middle school buildings. The building foundations experienced cracking due to expansive soils beneath the slab-on-grade foundation design. School district conducted review and determined that the pre-design subsurface investigation by the geotechnical engineer was insufficient and should have discovered the expansive soils and recommended against […]
Single prime design delivery on the renovation of ductwork in a University building which houses both a geo-chemistry lab and student dormitory rooms. Exhaust hood fan speeds were insufficient to properly vent chemical fumes through auxiliary roof duct and instead, fumes entered general building ductwork and student dormitory area leading to health complaints from students. […]
Single prime design delivery system for the construction of a new school gymnasium facility and a classroom building at an existing elementary school. Due to an elevation error in the civil engineering plans, the new buildings were constructed 2 feet below the existing FEMA flood plain. Error was not discovered until after construction was completed. […]
Multiple prime delivery system plus construction manager at agency (no subcontracts) on a new elementary school construction project. School District alleged design and construction defects on project related to masonry walls and roof structure which led to water infiltration and mold. Alleged claim value exceeded available design professional insurance.
The RT ECP team frequently publishes in-house articles, reposts relevant news reports and creates educational videos known as "quibinars". For more information or to subscribe, please click on the button below.
SUBSCRIBE TODAYUnfortunately Microsoft is no longer providing support or security fixes for your web browser. RT Specialty values the safety and security of its clients’ data, and as such this site requires the use of a modern web browser. To update your web browser, please see the links below. If you have any questions or would like additional information, please email info@rtspecialty.com or call (312) 784-6001.
Firefox
|
Chrome
|
Internet Explorer
|
Microsoft Edge
|